Project: Krejci Dump Site (CERCLA)

Client: National Park Service

Location: Cuyahoga Valley National Park, Ohio

Years: 2008-2013

Activities: MCG provided guidance and recommendations to the National Park Service (NPS) Environmental Compliance and Response Branch for the Krejci Dump Site remedial action. The remedial effort began in 1987, all remediation goals were achieved by 2012 and site restoration was completed in 2013 ( magazine article at:  http://www.conservancyforcvnp.org/file/annual-reports/Magazine_Fall15-Winter16.pdf ). MCG provided independent review and oversight of cleanup and restoration activities from 2008 through 2012. MCG also performed erosion control study and provided quality assurance oversight.  Data usability reports, DUR 1, DUR 2, and DUR 3,included all cleanup verification data and an analysis of usability for cleanup verification purposes and are available for download on the MCG Documents page.

Prior to founding MCG, Dr. Gemperline was employed by the U.S. Bureau of Reclamation (BOR) and supported the National Park Service in its Krejci Dump Site cleanup effort. Dr. Gemperline provided technical leadership to BOR teams involved in the Krejci Dump Site remedial investigation and feasibility study and other projects. He developed the both remedial investigation technical approach for the Krejci Dump Site Remedial Investigation and Feasibility Study and the approach used for cleanup verification. Dr. Gemperline oversaw all site characterization activities. Risk-based composite sampling was initially developed for this project. Related papers and presentations are available on the MCG Documents Page.

1982actionimg124aCokriging ResultsKejciWestPCBsKrejci Dump Site 8_13_2013

 

 

 

 

 

 

 

 

 

 

 

Project: Crab Orchard PCBs OU (CERCLA)

Location: Crab Orchard National Wildlife Refuge, Illinois

Year: 2008-2012

Activities: CONWR is located in southern Illinois, approximately 5 miles west of Marion, Illinois, primarily in Williamson County. The Industrial Area (Site 33) encompasses approximately 114 acres and is currently used for munitions manufacturing. MCG Supported the U.S. Fish and Wildlife Service by preparing a risk-based sampling plan to support decisions related to cleanup verification of the Industrial Area. The plan was designed to provide acceptable assurance that all consequential PCBs contamination was properly addressed. MCG designed the plan and provided onsite review of implementation activites. MCG also reviewed all data and provided independent quality assurance oversight.Site Overview

Project: Brightwater WastewaterTreatment Plant

Client: King County WA. Office of the Prosecuting Attorney

Location: King County, WA.

Years: 2011-2012

Activities: Assisted King County, by providing expert geotechnical evaluation related to excessive deformation of a 66-inch steel pipe  at the Brightwater Treatment Plant. MCG developed and used laser imaging methods to profile and analyze the circumferential and longitudinal deformation along the alignment.

Amster pic 

STA 288 cropped negative L3OLYMPUS DIGITAL CAMERA

Plot2

 

plot 1

 

 

 

Project: Muletown Conduit

Client: U.S. Department of Justice

Locations: Wiskeytown National Recreation Area

Year: 2013-Present

Activities: Providing expert analysis and testimony regarding the performance of the Muletown Conduit. Project is Under Litigation Hold.

 

Project Name: Orphan Mine Site, (CERCLA)

Client organizational name: National Park Service, Contaminated Sites Program,

1050 Walnut Street, Suite 220, Boulder, CO 80302

POP: Hitachi Consulting

Geographic Reach: The approximately 30 acre site is located on the south rim of the Grand Canyon in the Grand Canyon National Park.

Project Objective: Cleanup and restore the former mining site.

MCG  Task: Provide technical consultation.

Accomplishments: Under Litigation Hold.

4574Picture 053

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project: Civil Action

Client: Kay, Casto and Associates

Location: West Virginia

Years: 2005-2007

Activities: Assisted attorneys by providing expertise needed to determine the cause of an 84 inch drainage pipeline failure. This included characterization of movement and pipe soil-structure interaction analyses.

DSC00914wsketch61Long exposure00026990750-R1-014-5A

 

 

 

 

 

 

 

 

 

Project: TVA Kingston Fossil Fuel Plant Release Site (CERCLA)

Client: BOR/USEPA

Locations: Kingston, Tennessee

Activities: The TVA Kingston Fossil Plant coal fly ash slurry spill occurred just before 1 a.m. on Monday December 22, 2008, when an ash dike ruptured at an 84-acre (0.34 km2) solid waste containment area at the Tennessee Valley Authority’s Kingston Fossil Plant in Roane County, Tennessee.  1.1 billion US gallons (4,200,000 m3) of coal fly ash slurry was released (Wikipedia).MCG Reviewed plans and evaluated the stability of both the remaining earthwork and replacement dikes.  MCG Performed laboratory test to evaluate the potential use of electro-osmosis to consolidate the remaining fly ash.

pic 060209_18

 

 

 

 

 

 

 

 

 

 

 

 

 

Project: Old Yuma Mine (CERCLA)

Client: NPS

Locations: Saguaro National Park, AZ

Activities: Reviewed EE/CA QAPP and Sample Analysis Plan and made recommendations to improve efficiency and effectiveness of the mine site characterization.

pic2

pic1

http://upload.wikimedia.org/wikipedia/en/6/62/Old_Yuma_Mine_Tucson_Mountains_Arizona_Circa_1920.jpg

 

Project: Grand Canyon High School

Client: National Park Service

Places: Grand Canyon National Park, Arizona

Year: 2007-2009

Activities: MCGled the design, implementation and reporting effort for a program to evaluate persistent rumors that the athletic field was constructed using radioactive fill.

pic1Pic2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project: Underground Storage Tank (UST) Investigation

Client: Veterans Administration

Locations: Grand Junction, Colorado

Activities: Developed and implemented plans investigating the potential for groundwater contamination from an underground fuel storage tank.

picIMG_7483

 

 

 

 

 

 

 

 

 

 

Project: McClusky Canal

Client: Bureau of Reclamation

Location: North Dakota

Activities: Evaluated slope failures along a two mile reach of the 75-mile long McClusky Canal, Evaluated risk to canal workers and recreational users, and recommended alternative remedial measures.pic pic2pic3pic4Picture1

 

Project‑Constrained Modulus of Gravel and Crushed Rock

Activity: Large Scale Testing of Crushed Rock – Research

Client: Plastics Pipe Institute

Location: MCG Geotechnical Laboratory, Colorado

Activities: Developed a one-dimensional Compression Test to determine the constrained modulus of gravel and crushed rock and performed a parametric study to evaluate the effect of crushed rock properties on constrained modulus. The full report may be downloaded on from the MCG Documents page or by clicking MCG Final Ms Study Report031410.

IMG_4632

Project‑Use of Recycled Materials in Controlled Low Strength Material (a.k.a. flowable fill)

Activity: Laboratory testing- Research

Client: Plastics Pipe Institute

Location: University of Colorado, Denver & MCG Geotechnical Laboratory, Morrison Colorado

Activities: Evaluated the physical characteristics of flowable fill mix designs that utilizes the waste products of the energy production and recycled material industries. These included spray drier ash, bottom ash, fly ash, crushed glass, crumb rubber, sand-size crushed concrete and other material. (Beneficial use of recycled materials in flowable fill (CLSM))

pic1 pic2 pic3 pic4 pic5 pic6

 

 

 

 

 

 

 

 

 

 

 

 

Project‑Maya Initiative

Activity: Structural Evaluation of Archeological Excavations, Tunnels, and Unearthed Mayan Structures

Client: Getty Conservati0n Institute

Location: Joya De Ceren, El Salvador and Copan, Honduras

Activities: Dr. Gemperline evaluated the stability of unearthed structures, tunnels, excavations and shelters at Mayan Archeological sites in Honduras and El Salvador. Recommendations for preservation and conservation were made. Cracks had recently developed in the Hieroglyphic Staircase at Copan and that were suspected to be caused by ground movement associated with an underlying archeological tunnel. Also evaluated the effect of groundwater, vegetation and algal growth on the recently unearthed Mayan structures near Copan.   (Click here to view Getty project summary)(Click here to view Getty report) Additionally, the stability of excavations that unearthed adobe ruins near Joya De Ceren, El Salvador was analyzed and recommendations to achieve sustainable were preservation made.  Seismic analysis of unearthed structures, cut slopes, and modern structures that covered the sites were performed. The risk of groundwater intrusion was evaluated,  feasibility level designs that ensure seismic stability of structures of archeological structures were developed. Furthermore an early  warning system to alert of potential groundwater flooding was designed. Emergency actions necessary to protect archeological structures in the event of groundwater flooding were developed.797403-R1-2A 797402-R1-5A 797403-R1-5Aajpg Dscn2098_a Dscn2100_a DSCN2132 DSCN2180 Figure 1_3b Figure 4_2 Figure 4_5 Joya de Ceren 797450-R1-14A copan DSCN2233 DSCN2239DSCN2399 DSCN2420 DSCN2425 foundation_displacement GreatPlazaDrain roots undercut_tunnel